We have recently completed a ventilation scheme for the new Lamination Production building at Formica Group Europe.
The scheme provides high quality filtered air into the building and temperature controlled mechanical extraction. The system includes a heat recovery plant which provides warm air into the adjacent warehouse building. The plant has intelligent temperature sensing control to ensure optimum energy savings.